All workflows

Workflow · Low effort

Weekly project status

Turn scattered project updates into a concise repeatable weekly status.

ProjectProgrammeDelivery
Open Notion (opens in a new tab)

Opens the tool in a new tab. Sign-in or a plan may be required there. Follow the steps below and return to check your result.

Step by step

Here’s how to do it

Work through these steps in order. Your notes stay on this page until you copy them; nothing runs automatically.

What you’ll need
  • Current updates, milestones, risks and decisions.
  • The previous status report and reporting period, if available.
  1. Gather this week’s updates

    1. In your Notion workspace, use the new-page control, add a clear title, then type or paste the checked material. Use /h1 for headings or /todo for agreed checklist items.
    2. Include the reporting dates and the previous report if you have one.
    Start with
    Project sources.
    You’ll have
    Bounded current source set.

    Notion’s page guide (opens in a new tab) · Checked

  2. Put the updates into clear groups

    1. Use headings for progress, milestones, risks, decisions and next actions.
    2. Put each update under the right heading. Keep its source and mark anything that is not confirmed.
    3. In ChatGPT, paste the prompt below with this step’s source material, then send it. Review the answer before carrying it forward.

    Prepare your prompt

    Add your details, then copy the prepared prompt into the tool. This helper combines your text with the task instructions.

    View prepared prompt
    Organise these project updates under Progress, Milestones, Risks, Decisions and Next actions. Retain each source and date. Mark unconfirmed updates clearly. Do not infer progress.
    
    Requested output format:
    Heading | Update | Source | Confirmed or unknown
    Start with
    Source set.
    You’ll have
    Structured updates.

    ChatGPT’s official guide (opens in a new tab) · Checked

  3. Compare this week with the last report

    1. Read the previous report beside the current updates.
    2. List what changed, what stayed the same and what is still unknown. Do not infer progress from silence.
    3. In ChatGPT, paste the prompt below with this step’s source material, then send it. Review the answer before carrying it forward.

    Prepare your prompt

    Add your details, then copy the prepared prompt into the tool. This helper combines your text with the task instructions.

    View prepared prompt
    Compare the current updates with the previous report. List what changed, what stayed the same and what is unknown. Point to both source records for each claimed change.
    
    Requested output format:
    Heading | Update | Source | Confirmed or unknown
    Start with
    Normalised updates plus prior status.
    You’ll have
    Delta summary.

    ChatGPT’s official guide (opens in a new tab) · Checked

  4. Draft the weekly report

    1. Write a short summary, followed by progress, risks, decisions needed and next actions.
    2. Use the supplied evidence for status labels. Write “Unknown” where information is missing.
    3. In ChatGPT, paste the prompt below with this step’s source material, then send it. Review the answer before carrying it forward.

    Prepare your prompt

    Add your details, then copy the prepared prompt into the tool. This helper combines your text with the task instructions.

    View prepared prompt
    Draft a concise weekly project report from these checked updates. Include a short summary, progress, risks, decisions needed and next actions. Preserve stated owners and dates. Do not invent a traffic-light status or missing progress.
    
    Requested output format:
    Heading | Update | Source | Confirmed or unknown
    Start with
    Delta summary plus current data.
    You’ll have
    Structured status draft.

    ChatGPT’s official guide (opens in a new tab) · Checked

  5. Check the report before sharing

    1. Verify dates, owners, status labels and figures against the sources.
    2. Check that urgent issues are described accurately and that someone has agreed any requested action.
    Start with
    Draft report.
    You’ll have
    Approved report.
  6. Save or share the approved report

    1. In your Notion workspace, use the new-page control, add a clear title, then type or paste the checked material. Use /h1 for headings or /todo for agreed checklist items.
    2. Confirm the audience before sending a link or distributing a copy.
    Start with
    Approved report.
    You’ll have
    Stored/distributed status.

    Notion’s page guide (opens in a new tab) · Checked

0 of 6 step checks complete. A reader can understand position, material changes, key risks and required decisions without opening every source.

Before you share or switch it on
  • Check dates, numbers and reporting period.
  • Separate confirmed progress from assumptions.
  • Approve before distributing the report.

Logo credits

Firefox and Mozilla

Firefox and Mozilla product marks are trademarks of the Mozilla Foundation in the US and other countries. No affiliation or endorsement is implied.